Setting up & Configuring EMC VNXe3150 iSCSI SAN Storage with High.


Setting up EMC VNXe3150 iSCSI SAN Storage

Finally, the EMC VNXe3150 got installed and configured and almost ready to start transition from old EMC AX4 to the new VNXe3150. In the initial stage, found a bit difficulties to get it configured correctly as every EMC documentation speaks about something else specially when it comes to iSCSI High Availability, they mix between NFS HA and iSCSI HA. In reality, both Storage HA of NFS and iSCSI differ from each other. Simply, NFS uses Link Aggregations with LAG/LACP and iSCSI is not.

Equipment

  • VNXe 3150 with dual storage processors with software version 2.4.0.20932
  • Two Dell Stackable 6224 – 24 port Gigabit switches configured with Jumbo frames for iSCSI and Flow Control Enabled.
  • One – ESXi VMware ESXi 5.1.0 build-799733 host with 6 Gig pNIC’s two pNICs used for iSCSI connectivity only

Configuration on the VNXe

The configuration part is a bit of dilemma when it comes to iSCSI connectivity. In VNXe I set up two iSCSI Servers, one for Storage Processor A and one for Storage Processor B. Each SP has two IP Addresses configured for each Ethernet Interfaces, eth2 & eth3

iSCSI Server Settings-1

iSCSI Server Settings-2

iSCSI Server Settings-3

 

 

 

 

 

 

 

All the Ethernet Interfaces are configured with 9000 mtu size for Jumbo Frame;

MTU Config SPB

MTU Config SPB-eth3

 

 

 

 

 

 

 

Storage Resources Configuration

Storage Elements iSCSI Server Port IP Address MAC Address pSwitch Port VMKernel iSCSI PortGroup
iSCSI-A iSCSI_ServerA eth2 10.90.8.1 8:0:1b:57:71:3e 2/g1 iSCSI-01  10.90.8.78 vmk1
eth3 10.100.8.1 8:0:1b:82:78:dd 1/g1 iSCSI-02 10.100.8.78 vmk2
iSCSI-B iSCSI_ServerB eth2 10.90.8.2 8:0:1b:58:59:0f 2/g2 iSCSI-01  10.90.8.78 vmk1
eth3 10.100.8.2 8:0:1b:cd:f3:26 1/g2 iSCSI-02 10.100.8.78 vmk2

As you can see in the above screen shot and configuration table, each storage process have two Ethernet ports, each Ethernet port is connected to iSCSI pSwitch, eth2 in SPA matched eth2 in SPB. So since both of these interfaces are connected to the same pSwitch and same IP subnet is configured on both, single iSCSI VMkernel PortGroup on the same subnet can reach to both Storage Processors through single physical adapter “vmnic”

VNXe Connectivity Diagram

 VNXe Network Diagram

 

 

 

 

 

 

 

 

 

iSCSI Switches Configuration

Both network switches are configured as master and slave stackable switches, basically for this type of configuration you will not require to stack the switches as each of pair SP Ethernet are connected to the same switch. i;e SPA-Eth2 in pSwitch1 & SPB-Eth2 in pSwitch1. But with NFS configuration you will require to stack the Switches as you will need to configure LAG/LACP for true High Availability

Set up Jumbo Frames on the two iSCSI gig switches so that all the ports are using support Jumbo Frames. Below commands will let you configure all the ports with mtu size 9000

Console(config)#Interface range ethernet all

Console(config-if)#mtu 9000

ESXi host configuration

Each of the Gigs port in ESXi host is connected to the Physical iSCSI Switches. Two VMKernel PortGroups created in vSwitch1. Each of the iSCSI Kernels is mapped to the physical interface in ESXi.

Switch Name      Num Ports   Used Ports  Configured Ports  MTU     Uplinks

vSwitch1         128         8           128               9000    vmnic2,vmnic6

PortGroup Name        VLAN ID  Used Ports  Uplinks

iSCSI-02              0        1           vmnic6

iSCSI-01              0        1           vmnic2

vmk1       iSCSI-01            IPv4      10.90.8.78   255.255.255.0   10.90.8.255     00:50:56:6e:ea:87 9000    65535     true    STA                                  TIC

vmk2       iSCSI-02            IPv4      10.100.8.78 255.255.255.0   10.100.8.255    00:50:56:64:c0:6d 9000    65535

iSCSI vSwitch Ports

To check the connectivity is mapped correctly for each iSCSI PortGroup to reach the correct Ethernet Interface in the Storage Processor; vmkping with –I will allow you to specify the source interface to reach the destination iSCSI target; as this will test the whole path end-to-end from VNXe Storage, ESXi Hosts to Physical iSCSI Switches to make sure connectivity can flow with jumbo frame.

iSCSI Adapter Port Binding

Both iSCSI VMKernel portgroups has to be enabled for port bindings in the iSCSI Initiator adapter of ESXi.

iSCSI Port Bindings

 

 

 

Connectivity Results

# vmkping -I  vmk1 10.90.8.1 -c 50 -s 9000

PING 10.90.8.1 (10.90.8.1): 9000 data bytes

9008 bytes from 10.90.8.1: icmp_seq=0 ttl=255 time=0.596 ms

9008 bytes from 10.90.8.1: icmp_seq=1 ttl=255 time=0.575 ms

9008 bytes from 10.90.8.1: icmp_seq=2 ttl=255 time=0.548 ms

— 10.90.8.1 ping statistics —

3 packets transmitted, 3 packets received, 0% packet loss

round-trip min/avg/max = 0.548/0.573/0.596 ms

# vmkping -I vmk1 10.90.8.2 -c 50 -s 9000

PING 10.90.8.2 (10.90.8.2): 9000 data bytes

9008 bytes from 10.90.8.2: icmp_seq=0 ttl=255 time=0.591 ms

9008 bytes from 10.90.8.2: icmp_seq=1 ttl=255 time=0.617 ms

9008 bytes from 10.90.8.2: icmp_seq=2 ttl=255 time=0.603 ms

# vmkping -I vmk2 10.100.8.1 -c 50 -s 9000

PING 10.100.8.1 (10.100.8.1): 9000 data bytes

9008 bytes from 10.100.8.1: icmp_seq=0 ttl=255 time=0.634 ms

9008 bytes from 10.100.8.1: icmp_seq=1 ttl=255 time=0.661 ms

9008 bytes from 10.100.8.1: icmp_seq=2 ttl=255 time=0.642 ms

— 10.100.8.1 ping statistics —

5 packets transmitted, 5 packets received, 0% packet loss

round-trip min/avg/max = 0.634/0.661/0.708 ms

# vmkping -I vmk2 10.100.8.2 -c 50 -s 9000

PING 10.100.8.2 (10.100.8.2): 9000 data bytes

9008 bytes from 10.100.8.2: icmp_seq=0 ttl=255 time=0.694 ms

9008 bytes from 10.100.8.2: icmp_seq=1 ttl=255 time=0.658 ms

9008 bytes from 10.100.8.2: icmp_seq=2 ttl=255 time=0.690 ms

Add ESXi hosts to VNXe

Setup the ESXi hosts to access VNXe iSCSI SAN Storage. This can be done by browsing into the VNXe > Hosts > VMWare will allow you to find ESX hosts either by typing in the IP Address of the vCenter or the management network of the ESXi itself. Then create VMFS datastore on the VNXe and make sure you are assigning permission to the ESXi host to access the newly created LUN.

After the LUN is presented to the ESXi host and formatted with VMFS now it’s time to change the path selection through from default Fixed to Round Robin and change the Round Robin default IOPS limit in ESXi from 1000 to 1 which will allow you to utilize all the iSCSI paths.

esxcli storage nmp psp roundrobin deviceconfig set –type=iops –iops 1  –device=naa.6006048c2fb691695617fc52e06065a2

Once it’s change you will see all the paths with Active(I/O) for each LUN that changed from Fixed to Round Robin.

Path Round Robin

 

 

 

Failover – Failback Testing Scenarios

For the failover testing I have presented 500 GB LUN and created two Virtual Machines, and installed Windows 2008 R2 Enterprise Edition. Roles installed on this guest machine;

  • Microsoft Active Directory Role Services
  • Microsoft DNS Server Services
  • Exchange Server 2010 with all the Roles.

The second Virtual Machines are a Windows 7 Professional client with Microsoft Outlook 2010 connected to the Exchange 2010 MAPI profile. Sending and receive emails internally is operational in normal mode.

Testing Networking

I have tested failover with network issues scenarios by disconnecting one pNic “vmnic2” from the vSwitch1 that mapped to iSCSI-01 portgroup and at the same time vmkping –I vmk1 was running against both VNXe iSCSI Target IP’s SPA-Eth1 “10.90.8.1” & SPB-Eth2 “10.90.8.2” and ping continues well.  If a Storage Processor (SPA) fails/rebooted on VNXe, the working Storage Processor (SPB) picked up the workload that was handled by SPA.

Testing Networking-1

  • As you can see in the above screen shots, Virtual Machines Windows 7 Client continued pinging the Exchange Server and Exchange Server continued to ping Windows 7 Client.
  • Vmk1 = iSCSI-01 which mapped to vmnic2 stopped pinging to the SPA-Eth2 & SPB-Eth2.
  • LUN Paths both links mapped to vmnic2 subnet 10.90.8.x dead and 10.100.8.x paths mapped to vmnic6 ‘vmk2’ “iSCSI-02” are live and Active(I/O).

Path Round Robin-Failuer

 

 

 

 

 

Ping  “vmnic6” via vmk2 to 10.100.8.1 & 10.100.8.2

# vmkping  -I vmk2 10.100.8.1

PING 10.100.8.1 (10.100.8.1): 56 data bytes

64 bytes from 10.100.8.1: icmp_seq=0 ttl=255 time=0.229 ms

64 bytes from 10.100.8.1: icmp_seq=1 ttl=255 time=0.192 ms

64 bytes from 10.100.8.1: icmp_seq=2 ttl=255 time=0.238 ms

— 10.100.8.1 ping statistics —

3 packets transmitted, 3 packets received, 0% packet loss

round-trip min/avg/max = 0.192/0.220/0.238 ms

~ # vmkping  -I vmk2 10.100.8.2

PING 10.100.8.2 (10.100.8.2): 56 data bytes

64 bytes from 10.100.8.2: icmp_seq=0 ttl=255 time=0.235 ms

64 bytes from 10.100.8.2: icmp_seq=1 ttl=255 time=0.245 ms

— 10.100.8.2 ping statistics —

2 packets transmitted, 2 packets received, 0% packet loss

round-trip min/avg/max = 0.235/0.240/0.245 ms

Relink vmnic2 to vSwitch1 and ping resumed back to SPA-Eth2 & SPB-Eth2

ReLink vmnic2 vSwitch1

 

 

 

 

 

 

 

 

LUN paths resumed

Path Round Robin-Path Resumed

 

 

 

 

 

 

Testing Power Failure of VNXe Storage Processors-A & Storage Processor-B

The second test was done by removing the physical power from Storage Processor-B and initiate vmkping to both Ethernet Interface of SPB from both VMKernel vmk1 & vmk2, as a result vmkping continues as the traffic routed peer SP port.

Testing Power Failure

 

 

 

 

 

 

Result of ping after

Below result shows that Exchange VM continues to ping the Client VM during Storage Processor-B shutdown.

Result of Ping after SP-B Power Failure

 

 

 

Did the same with Storage Processor-A and initiated ping to both Ethernet Interfaces of SPA. Ping continues to both Ethernet Interfaces as well as pings inside each VM “Exchange Server to Client” and vice versa continues as well and Exchange Server VM didn’t give any freeze / errors in event viewer.

Conclusion

The VNXe3150 high availability feature at storage level and networking level ensures data protection against any single component failure in Storage Level and Networking Level.

Advertisements

, , , , , , , , , , ,

Leave a comment

Integration Veeam Backup with Symantec Backup Exec 2010


Integration Veeam Backup with Symantec Backup Exec 2010

Introduction:

This document highlights some necessary steps required to setup a successful Veeam Backup and Symantec Backup Exec 2010 for tape integration and off-site storage.

Steps to a successful integration:

Veeam B& R v6.0.0.181 is installed on a Virtual Machine running guest operating system Windows 2008 R2 64bit with 8 GB of Ram and 2 Virtual vCPU Sockets and 4 Cores for each socket. The Veeam resources it depends on the environments and workload that put on the backup during backup operation.

All backup repositories’ are mapped through iSCSI Initiator with MPIO. The sizing of the repositories also it depends on each environment and how much data needs to be restored from disk and for how long. Again, this retention period plays a big role in the repository storage and how big your storage is.

In my environments, I have multiple targets;

No

Repository Target

Size

1. IBM iSCSI – DS3500 2.0 TB
2. IBM iSCSI – DS3500 745 GB
3. EMC iSCSI – AX4-5i 800 GB
4. OpenFiler iSCSI 2.3 1.4 TB
5. IBM iSCSI – DS3500 2.0 TB
Total 6.9 TB

Veeam Backup Configuration:

All the above repositories are added to the Veeam Backup & Replication v.6.0.0.181. Backup jobs configured for each VM to one of the above repositories.

Due to lack of disk space in the repositories and which limits the number of days  ofbacked up VMs should remain on disk, all the backup jobs are configured as follows;

Categorizing the backup jobs based on roles of the Virtual Machines helps a lot from backing up static Virtual Machines which doesn’t change very often.

No

Backup Category

Descriptions

1. Critical Virtual Machines Virtual machines are changing dynamically, such as Mail Server, file Server, Archive Server, Sharepoint, etc..
2. Non-Critical Virtual Machines Virtual machines are not changing on a daily basis, such as AntiVirus, Proxy Servers, WSUS, Deployment Serves

Critical Virtual Machines Job Settings:

Since those Virtual Machines are changing dynamically and daily, weekly and monthly backup requires for them backup job settings are configured based on the disk space and how long we can restore from disk.

Restore points to keep on disk: = 5

Deleted VMs data retention period: = 5

Backup Mode set as Incremental and Weekly Friday Active Full Backup. And schedule backup Sunday through Friday.

This settings result 1 Full Backup on Friday .vbk file and Sunday through Thursday is incremental which will gives 5 .vibs files.

Note: Since the Deleted VMs data retention period set to 5, CheckDataValue() when it reaches to 5 days, the full last backup chain will be deleted from disk and will have a new .vib file changed with last .vbk file.

Example:

Full Backup runs on 27th April, 2012 it will have a chain of Sunday through Thursday.

Week#1

No

Backup Date

Day

Backup Mode

1. 04/27/2012  02:43 VM001012012-04-27T143033.vbk Friday Full
2. 04/29/2012  02:37 VM001012012-04-29T143033.vib Sunday Incremental
3. 04/30/2012  09:42 VM001012012-04-30T093346.vib Monday Incremental
4. 05/01/2012  02:37 VM001012012-05-01T143039.vib Tuesday Incremental
5. 05/02/2012  02:37 VM001012012-05-02T143047.vib Wednesday Incremental
6. 05/03/2012  02:38 VM001012012-05-03T143029.vib Thursday Incremental

Week #2

No

Backup Date

Day

Backup Mode

1. 05/05/2012  11:18 VM001012012-05-04T143026.vbk Friday Full
2. 05/06/2012  02:36 VM001012012-05-06T143052.vib Sunday Incremental
3. 05/07/2012  02:36 VM001012012-05-07T143038.vib Monday Incremental
4. 05/08/2012  02:36 VM001012012-05-06T143052.vib Tuesday Incremental
5. CheckDateValue()
6.

When CheckDateValue() reach next week Wednesday, the previous backup chain will be deleted entirely.

Non-Critical Virtual Machines:

The same applies to the non-critical virtual machines backup jobs, except those backup jobs are set to 1 for both values, Restore points to keep on disk:= 1 && Deleted VMs data retention period:= 1.

This will allow only one restore point on disk.

Symantec Backup Exec 2010 Configuration:

All traditional backup software, the well-known backup methods are Full, Incremental or Differential. With Symantec Backup Exec 2010 and Veeam Integration there is a caution in here to select which backup methods to use when you Backup the Veeam Images *.VBK or *.VIB files.

In Symantec when Full Backup is configured to backup Veeam Images it will Backup everything on the drive and will reset the file Archive Bits.

When Veeam Backup runs again and created a VIB file or VBK file and again Symantec Runs as Incremental against veeam files, only the last changed files will be backed up.

But, when Symantec Full backup runs against Veeam, it will backup everything on the drive, means all Full *.VBK Files along with all *.VIB files. This increase the possibility of taking long time to finish the backup as well as doubling the backup twice.

The best option in here to backup Veeam Image using Symantec is to set all the backup methods as Incremental with Reset-Archive-Bit including Daily, weekly and Monthly Backup.

Also, Since Veeam Backup & Replication doesn’t have the option to set a monthly Backup, the last Wednesday of Last Week in the month can be considered as monthly backup and again the Backup Method has to be Copy otherwise backup will not backup anything to tapes because the Archive-Bit has been reset already.

In my example, Wednesday is my CheckDateValue() that configured on the Veeam backup jobs. So, all previous chain will be deleted.


, , , , ,

12 Comments